ANALISIS FAKTOR RISIKO TERHADAP KETERLAMBATAN PROYEK KONSTRUKSI THE HIMANA CONDOTEL
Abstract
One of the problems in construction activities is the risk of delays in the construction project. In The Himana Condotel project, several obstacles make some of the work not on the schedule. We analyze risk factors for delays to find out the dominan risk dan the solution. This research method uses a quantitative descriptive method and using questionnaires and interviews. The respondents were taken based on the criteria that are the respondent who has the important position at the Himana Condotel Project. From the data, we can specify the frequency and consequences occur risk that uses semantic differential scale in the questionnaire, that obtained the dominant risk factor based on the risk rating table with the highest risk level. After we get the dominant risk factors and the risk description, then we can determine the mitigation action that we can suggest. From the analysis, we get 5 variable risk factors for delay from The Himana Condotel project that is planning aspects, employment documents and contracts aspects, implementation aspects, resource aspects, and environmental aspects. Of the five aspects, the risk descriptions are described as 48. The dominant risk is obtained based on the percentage of the risk level, the risk level is obtained with a value of 36 %. From the five aspects of the risk factors for delays, all of them have high risks and 17 descriptions of risks that have a high-risk level. The suggested matters for the dominant risk mitigation to be carried out are more coordination between the parties involved, the preparation of schedule and planning in more detail, technical implementation in the fields especially for BQ, contract, work planning and terms to get more attention and increase the accuracy of the implementation of work as planned.
References
Ervianto, W. I. (2005). Manajemen Proyek Konstruksi (Edisi Revi). Yogyakarta: ANDI.
Flanagan, R., & Norman, G. (1993). Risk Management and Construction. London: Blackwell Science.
Husen, A. (2011). Manajemen Proyek. Yogyakarta: ANDI.
Kerzner, H. (2001). Project Management (Seventh Ed). New York: Jhon Wiley & Sons, Inc.
Labombang, M. (2011). Manajemen Risiko Dalam Proyek Konstruksi. SMARTek, 9(1), 39–46.
Norken, I. N., Astana, I. N. Y., & Manuasri, L. K. A. (2012). Manajemen Risiko pada Proyek Konstruksi di Pemerintah Kabupaten Jembrana. Jurnal Ilmiah Teknik Sipil, 16(2), 202–211.
Nurlela, & Suprapto, H. (2014). Identifikasi dan Analisis Manajemen Risiko pada Proyek Pembangunan Infrastruktur Bangunan Gedung Bertingkat. Jurnal Desain Konstruksi, 13(2), 114–124.
Proboyo, B. (1999). Keterlambatan Waktu Pelaksanaan Proyek: Klasifikasi dan Peringkat dari penyebab-penyebabnya. Dimensi Teknik Sipil, 1(1), 49–58.
Putera, I. G. A. A., Harmayani, K. D., & Putra, I. G. I. (2019). Manajemen Risiko Pelaksanaan Pembangunan Sistem Pengolahan Air Limbah Terpusat Kota Denpasar Tahap II (Jaringan Air Limbah Pedungan). Jurnal Spektran, 7(1), 42–50.
Renaldhi, M. R. (2014). Analisis Risiko Keterlambatan Proyek Pembangunan Tangki X di TTU-Tuban (Studi Kasus: PT. Pertamina UPMS V). Institut Teknologi Sepuluh Nopember Surabaya.
Rumimper, R. R., Sompie, B. F., & Sumajouw, M. D. J. (2015). Analisis Risiko pada Proyek Konstruksi Perumahan di Kabupaten Minahasa Utara. Jurnal Ilmiah Media Engineering, 5(2), 381–389.
Sukirno. (2015). Analisis Resiko Waktu Di Proyek Konstruksi Studi Kasus Proyek Ampuh Pressure Maintenence Di Duri, Riau. Rekayasa Sipil, 9(3), 201–210.
Wirawan, I. G. K., Sudarsana, I. K., & Purbawijaya, I. B. N. (2015). Manajemen Risiko Pada Proyek Konstruksi Dengan Metode Fast Track Studi Kasus Proyek Quinci Villas dan Putri Naga Komodo. Jurnal Spektran, 3(2), 29–36. https://doi.org/10.24843/SPEKTRAN.2015.v03.i02.p04
Yuliana, C. (2017). Manajemen Risiko Kontrak Untuk Proyek Konstruksi. Rekayasa Sipil, 11(1), 9–16. https://doi.org/10.21776/ub.rekayasasipil.2017.011.01.2
Authors who publish with this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
- Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).