ANALISIS ANGGARAN BIAYA KESELAMATAN DAN KESEHATAN KERJA PROYEK KONSTRUKSI GEDUNG SMA N 2 ABIANSEMAL

  • Ni Putu Indah Yuliana Politeknik Negeri Bali
  • Ni Kadek Sri Ebtha Yuni
Keywords: construction services, risk identification, risk assessment, OSH costs

Abstract

One of the efforts made by construction service companies to minimize accident rates is to implement an occupational safety and health management system (OSHMS) for construction. The construction service provider must provide costs for OSH requirements taken from the total project cost. This research has a certain purpose that is to find out the amount of occupational safety and health costs needed as well as the comparison between regulations and the field. The study was conducted in the form of surveys and interviews where the data analysis stage is to compile a list of risks that occur, risk assessment, risk mitigation, calculate OSH costs with the price of the store survey and SE No. 11/SE/M/2019 (SE19) prices and calculate the percentage of OSH costs to the contract. The results showed 22 accident and safety risks identified with 14 low category risks and 8 medium category risks. The OSH cost required based on the price of the field unit is IDR. 402,142,520.00, while the fee based on SE19 is IDR. 359,005,000.00. The OSH costs field prices are greater than OSH costs SE19 with a difference of 0.08% or IDR. 43,137,520.00.

References

Ananti, G. A. (2019). Analisis Biaya Keselamatan dan Kesehatan Kerja (K3) pada Proyek Konstruksi (Studi Kasus: Pembangunan Gedung Lt. II SD N 13 Kesiman. Seminar Nasional Keteknisipilan Bidang Vokasional VII, 247–251. Bali: Jurusan Teknik Sipil Politeknik Negeri Bali.

BPJS. (2019). BPJS Ketenagakerjaan. Retrieved January 16, 2019, from https://www.bpjsketenagakerjaan.go.id/berita/23322/Angka-Kecelakaan-Kerja-Cender

Djatmiko. (2016). Keselamatan dan Kesehatan Kerja. Yogyakarta: Deepublish.

Jawat, I. W., & Suwitanuwijaya, I. N. (2018). Estimasi Biaya Pencegahan dan Pengawasan K3 pada Proyek Konstruksi. PADURAKSA, 7(1), 88–101.

Norken, I. N. (2015). Pengantar Analisis dan Manajemen Risiko pada Proyek Konstruksi. Denpasar: Udayana University Press.

Sucita, I. K. (2011). Identifikasi dan Penanganan Risiko K3 pada Proyek Konstruksi Gedung (Studi Kasus: Proyek Gedung Centro City Residence). Poli Teknologi, 83–92.

Published
2020-10-27
Section
Articles
Abstract viewed = 869 times
PDF downloaded = 21260 times